Skip to content

RAMS Archive

Risk Assessment Method Statements for completed and active CRGI Solutions projects, produced per HPROC20.


Project RAMS

Project Ref Project Name Client Date Status
IPS01-0011 IPSEN Project (31/10/25) IPSEN October 2025 Complete
IPS01-0015 IPSEN Project (18/11/25) IPSEN November 2025 Complete
IPSEN-52029081 IPSEN RAMS 52029081 IPSEN 2025 Complete
WPS01-0001 WPS Project 2025 Complete

RAMS Documents

Full RAMS documents are retained in the HSQEMS secure archive and issued to clients prior to site mobilisation. Contact the Operations Manager for access.


RAMS Production Process

All RAMS are produced per HPROC20 (RAMS Production) using the HFORM15 template, which includes:

  • Project description and scope
  • Organisation and responsibilities
  • Risk assessment (Likelihood × Consequence matrix per HPROC01)
  • Method statement with step-by-step work activities
  • PPE requirements
  • Environmental considerations
  • Emergency procedures
  • Permit requirements
  • Training requirements
  • Sign-off and approval

RAMS Template

The standard RAMS template is available at HFORM15 — RAMS Template.


Document Reference
RAMS Production Procedure HPROC20
RAMS Template HFORM15
Risk Assessment Procedure HPROC01
Risk Assessment Template HFORM01

Document Owner: Sean Ashton, Operations Manager Last Updated: 14/03/2026